Hurricane Ike

Filed under: Pecan Farming — knewman @ 5:16 pm

The center of the eye of hurricane Ike passed just a few miles east of the pecan grove.  The residence itself received very little damage… some tar paper was blown off the roof.

The two porta potties for the construction crews didn’t fair as well!

There was damage to the pecan trees, but not nearly as bad as we expected.  A few were destroyed by splitting.  About 25 others were blown over.  We’ve pulled these back up with the tractor and tied them to adjacent trees… they should be ok.

Of the 5 types of pecans we have, the Pawnees are the first to be harvested, usually in the first 2 weeks of October.  Many of the Pawnee pecans were blown from the trees.  We’ve picked a lot of them up and find that they are good to eat, though a little premature.  The following picture shows some Pawnees emerging from their husk.

There was other damage… some of which could be easily fixed…

And some cannot!

The residents found this whole experience very stressful….

For pictures from around our house see the newman family blog in the menu at the top right.

Ken

August 24, 2008

Lots of Progress

Filed under: Pecan Farming,Pecan Grove,Rosamond Residence,Senior Residence — knewman @ 6:25 pm

We returned from Paris yesterday and went out to see the progress at the pecan grove this afternoon.  Most of the plywood is on the roof of the Sr. residence, and all the studs are up.

 

Mike and Ronda’s house is coming along well.  It’s “dried in” now, and is scheduled to be done in October.

Many of the pecan trees are loaded with pecans.  The photo below shows a cluster of 7 pecans.  Some of the trees are breaking due to the heavy load of fruit.  One tree, show below, has split so bad it will need to be cut off and grafted again, so only the strong root will be saved. 

Some of the trees have grown slowly and have no fruit.  Mike pulled some of these up and found that their tap root was growing in circles (see below).  Young trees are started in buckets and the tap root is forced to grow in a circle.  When the tree is removed from the bucket and planted, this root must be cut and the little that remains will usually straighten and go straight down.  Evidently when these trees were planted this wasn’t done, so they have no depth of root, and cumber the ground.  Unfortunately, we have quite a few trees that will have to be cut down… no amount of digging around them and fertilizing them would help.

Ken

 

August 4, 2008

Upward and onward

Filed under: Senior Residence — knewman @ 10:18 pm

 

Carpenters have been busy putting the wall puzzle togther.  It goes fast and neat when they’re all built offsite.

Walls are plumbed and aligned by Saturday.  Roof trusses are delivered and await a crane to help set them in place.

 

 

The well is complete with pump and tank set and just needs electrical power to pump water on demand.  We tried a generator but it takes a lot of juice. 

 

The drive to Jack and Leona Newman’s site got a culvert in the creek so heavy trucks can cross.  The drill truck showed up to take a sample of the soil where the house pad will be.

 

The local electric company finally got us in their schedule and looks like they’re serious about getting us some power.  Equipment and materials are stocked for underground service installation. 

The Rosamond residence is waiting on windows which arrived Thursday and these porch timbers which are getting mortised and tenoned for assembly. tgh

July 28, 2008

Water and steel

Filed under: Senior Residence — knewman @ 9:22 pm

After seven days allowing the concrete to cure, the steel arrived for erection.

 

The lower beams border the vaulted ceiling of the Great Room.  The high beam is the ridge.

 

The wall framing arrives in prebuilt sections.  It should take only two days to raise the walls.

On Wednesday the drilling crew arrived for the water well.  By Thursday they had finished drilling – final depth 385′.

 

 Friday the casing was inserted and cemented in and Monday the screen was installed.

 

Drilling part is done, now we just need plumbing and power.  tgh

July 18, 2008

Finally… a foundation!

Filed under: Senior Residence — knewman @ 8:44 am

The day of pouring the slab on the senior residence was quite exciting.  It started at 3 a.m. because the concrete plant had a full schedule.  Weather was perfect for pouring concrete, cool and somewhat humid.  Things got hotter once the sun came up. 

The day begins. Half-way.

Trucks woke me up at 4:00 a.m.  After deciding I was not going back to sleep, I got up and went to the site.  I found the concrete pouring was well underway.  By 5:00 half the concrete had been placed.  This job will take an estimated 360 yards.

Daybreak. Sunrise.

At 6:00 color was showing in the sky over the lake.  Sunrise at 6:30.

Slab levelling. Boom pump truck.

Once the concrete is hard enough to walk on, a machine is used to level out the minor variations of slab height.  A boom pump truck is used on jobs like this because of slab size and site conditions.  This truck can place concrete up to 130′ away from the pump at 3-4 yards per minute.

Almost done pouring concrete.

This is about the 35th truck at the pump.  Notice the man in the safety vest with the remote controls for the boom.

Final finishing work.

It’s 5 hours after the first concrete truck.  The slab by this time is quite hard.  There are no breaks for the men.  Anything that needs to be done to the slab has to happen now or it’ll be too late.  They have begun to apply the curing compound on the far end of the slab.

The finished slab.

The finished product. Red lines on the left are where they started laying out saw cuts to control future cracks in the slab.  The boy is cleaning up some recessed bolt threads where steel columns will go. 

Now that there is a foundation, y’all will have to check back more often.  Things will progress more rapidly than they have in the past few months.  tgh

« Newer PostsOlder Posts »

Powered by WordPress